Recent Projects

Explore recent sitework, excavation, utility, demolition, stream restoration, infrastructure, and civil construction projects completed by Bencardino Contractors throughout Philadelphia and the Delaware Valley.

85 Ben Fairless Drive

The JG Petrucci Tract in Fairless Hills PA is underway. Take a look at the progress January 5th. through January 21st. 2021 See the video here → JG Petrucci Tract Video The latest update showcases how the property is in the process of mass grading. Storm water retention ponds are being carved and connected to water distribution systems. The heavy construction fleet continues to prepare site to begin foundation…

View Project  »

Amazon Facility

This job was a special job right from the beginning. We were working for a brand-new customer Kruzinski and the conglomerate Amazon. It was a shock to us in our first zoom meeting on July 17th with both entities, that they needed this site turned over for full functionality by September 15th, 2020. We were a little shocked, but we got to work in typical Bencardino fashion. We moved fast and accurate. This job has a…

View Project  »

Beach Street

BEACH STREET Louis A. Bencardino and the experienced Bencardino crew are shown here processing recyclable material onsite to be used as backfill at Beach Street near Graffiti Pier in Philadelphia. This is part of an extensive sitework project being performed by Bencardino that will result in a sprawling residential development with over 1000 new homes and a retail shopping area close to the river's edge. Louis…

View Project  »

Central High School

Bencardino Excavating Contractors is using Reinforced Fiber Soils to reinforce the landscaping improvements at Central High School. As part of the Central High School improvement project, soil benching is being made and a pleasing landscape designed. This is the first time in Philadelphia that Reinforced Fiber Soils is being used by a construction company. In order to apply these new Reinforced Fiber Soils, we…

View Project  »

Porsche Of The Main Line

Bencardino Excavating is working with Gabriel Building Group on the construction of a brand new, three story, 33,000 sf showroom and service center. The site improvements require the removal of over 20,000 sy of material, two underground stormwater basins, new sanitary and water services lines along with 4,000 lf of curb and almost 10,000 sy of asphalt paving.

View Project  »

Moorestown Mall

Phase two of this exciting improvement project for the Moorestown Mall entailed transforming the eastern portion of the old Macy’s department store into a Michaels retail store. Work included installing a new loading dock, installation of all new utility service lines, removal and replacement of the existing curbs and sidewalks and reconfiguration of the existing parking/drive lanes to accommodate the new tenant…

View Project  »

Mavis Discount Tire

Bencardino Contractors is making way for a new Mavis Discount Tire location at Philadelphia Mills.Demolition of the old gas station near the entrance of Philadelphia Mills mall is underway. Bencardino has cleared out many overgrown trees and shrubs.Bencardino is installing new sanitary, and domestic water lines including a new storm system. Renovations include new site work, curbs and paving. The storm system…

View Project  »

Central High School

Bencardino Excavating Inc. has been hired by The Philadelphia School District as General Contractor to perform improvements at Central High School in Logan. Work commenced May 20th, 2019. This extensive project encompasses a complete redesign of the parking area, demolition of 20-foot-high retaining walls and an old coal tunnel along with the addition of a new underground storm-water system. There is also a new…

View Project  »

Widener Memorial School

Bencardino was awarded the Paving and Stormwater Management Project for the Widener Memorial School in Philadelphia. The project started is to be completed in two phases. Phase 1 started in early April 2019 and completed in middle of May 2019. Phase 2 started in early June 2019 and is scheduled to be completed by middle of August 2019. The project consists of constructing a new on-site storm system to control the…

View Project  »

Clara Barton Elementary School

Bencardino Excavating is working at the Clara Barton Elementary School in Bristol, PA. installing a roof structure on supporting canopy columns at the entrance for the new Administrative and Transportation Facility. The four canopy columns will be encased with a decorative brick finish along with a masonry sign.

View Project  »